BowLift | #1 Find GPS Cat Tracker with Real-Time Location, Waterproof Skip to content

Your Cart

Your cart is empty

4.7 out of five star rating
Rated 4.7/5 | +700 reviews

BowLift | #1 Find GPS Cat Tracker with Real-Time Location, Waterproof Design, and Activity Monitoring for Pet Safety and Tracking

Sale price£93.00
In stock

Free Shipping

90-day Returns

American Express Apple Pay Google Pay MastercardPayPalShop Pay Visa

Black Friday Sale

Only today: 50% off on this product
This product will likely sell out before Black Friday and the price doesn't get cheaper. Get yours now before it’s gone!

Ensure Your Cat's Safety No Matter Where They Roam

Picture the tranquility that comes with knowing your beloved pet is secure, even when they venture away. Thanks to the GPS tracker, you can identify your cat's precise location within seconds — eliminating the uncertainty of their whereabouts.


Boundary Alerts: Stay Proactive

Create a personalized "safe zone" through our user-friendly mobile app. If your cat wanders outside this defined area, you’ll receive an immediate notification — allowing you to respond before they go too far.

 


Exceptional Battery Performance Without Ongoing Costs

Unlike many trackers that require expensive subscriptions, the GPS Cat Tracker boasts an impressive battery life of up to 200 hours per charge — without any recurring fees. Just insert a data-enabled SIM card and start tracking.


Engineered for Comfort, Crafted for Exploration

At a mere 65g and connected to a gentle, anti-pull collar, this tracker guarantees comfort for every breed of cat. With an IP68 waterproof rating, it’s fully equipped for outdoor adventures — rain or shine.


How to Use

  1. Place a nano SIM card (with mobile data) into the tracker.
  2. Install the mobile app for iOS or Android and synchronize your device.
  3. Monitor your cat's location in real-time, define safety zones, and view their complete movement history directly from your phone.

Product Specifications

Weight 65g
Device Dimensions 65.5 × 37 × 18.3 mm
Battery 500mAh Li-ion | Up to 200 hours
Water Resistance Rating IP68
Location Precision GPS: 5–10m | WiFi: 10–20m | LBS: 50–500m
Supported Technologies GPS + AGPS + LBS + WiFi
Platform MTK2503D | Quad-band GSM
Charging Method USB (cable included)
Available Colours Black, White, Blue, Yellow, Green

Included in the Box

  • 1x GPS Cat Tracker
  • 1x Soft Anti-Yank Collar
  • 1x USB Charging Cable
  • 1x User Manual

Frequently Asked Questions

Q1: Is a subscription necessary?
A1: No. You just need a nano SIM card with mobile data (e.g., EE, O2, Vodafone). There are no monthly fees or charges for the app.

Q2: Will it fit my cat?
A2: Yes. The lightweight tracker is designed for cats of all sizes and breeds, including smaller or older cats.

Q3: Can I track multiple cats?
A3: Certainly. The app allows you to connect and track several devices at the same time.

Q4: Is the GPS signal reliable?
A4: Yes. The tracker employs GPS, AGPS, WiFi, and LBS triangulation for precise tracking, both indoors and outdoors.

Q5: What if the battery is low?
A5: You will receive a notification through the app, giving you ample time to recharge the device before it powers down.

Q6: Is the app user-friendly?
A6: Yes — the app is intuitive, available in English, and compatible with both Android and iOS. You can track live locations, set alerts, review your cat's history, and more.


Reasons Why Pet Owners Prefer GPS Cat Tracker

“This device has restored my peace of mind. I always know where my cat is — and she hardly realizes she’s wearing it.” — Donald R. *Verified UK Customer

Every year, countless cats go missing across the UK. The GPS Cat Tracker helps you take a straightforward step that could save you from hours of anxious searching.

Allow your cat to roam freely — and enjoy your peace of mind.

You asked, we answered.

Frequently Asked Questions

Try Risk-Free For 90 Days

100% Money-Back Guarantee

If, for any reason, your are not satisfied with your new find within 90 days, we'll refund your money, no questions asked.